Monday, July 26, 2010

Progress

Here are some pictures from a recent visit to the campus. I'll post some more soon. Between the time these were taken and now, we have started installing windows, and there has been great progress on our ecological sanitation system.

A view of the girls dorm from the Multi-Purpose Hall, with the matrons/patrons home on the right:


The mason is installing the architectural bricks in the MPH -- how effective these are re: allowing light in and keeping the dust out remains to be seen:


This is the view from the staff housing (six 3-bedroom apartments in a 3-story structure):

(the classroom building is on the left with the laboratories at the end; this is followed by the girls dorm and the matrons/patrons residence; the multipurpose hall is obscuring the boys dormitory.)

No comments:

Post a Comment